Shipping Verification

This item is not available for shipping to and will not be added to your cart.
This item is available for shipping to and was added to your cart.

This item can only be delivered to select locations

Please enter your delivery zip code below to determine shipping eligibility:
Invalid zip code. Please enter a 5-digit US zip code. .

Product(s) Added

Add Product(s) to Favorites List

The product(s) has been added to {{ listName }}

Enter a new name for this list:

This is a required field. Invalid list name. Name may only contain letters, numbers and the characters : - _ or space.
My Location
You are delivering to
{{currentLocation}}

Nearest Branch:
{{ selectedBranch.Line1 }}
{{ selectedBranch.Line2 }}
{{ selectedBranch.City }}, {{ selectedBranch.State }} {{ selectedBranch.PostalCode }}
Cart
There are item(s) in your cart.
CHECKOUT View Cart
Most Recently Added:
No items

Tilt-Up Slabs

As a tilt-up slab contractor, you are likely familiar with the many benefits of this construction method. But for those who are not, here is a brief overview: Tilt-up slabs are made by casting concrete in horizontal molds, which are then tilted upright. This type of construction is quick and economical, and it can be used to create both simple and complex designs.

In addition, tilt-up slabs can be produced in any size or shape, making them a versatile option for commercial and residential projects. If you're considering using tilt-up slabs on your next project, here are some things to keep in mind.
Tilt Up Precast and Accessories - Tilt Up Insulation Slabs

Panel Forming for Tilt-Up Slabs

Panel forming for tilt-up slabs begins with creating the perimeter forms. These forms define the edges of the panel and determine the shape of the door and window openings. The forms are built using 2x lumber or plywood and must be strong enough to support the weight of the wet concrete.

The forms must also be designed so that the finished panels will have the desired shape and surface finish. Doors and windows can be incorporated into the forms or cut out after the panel has been placed in position.

After the door and window openings are designed, the forms can be filled with concrete. The concrete is poured into the forms and spread evenly using a trowel. Once the concrete has been smoothed out, it is allowed to cure for 24 hours.

There are a couple of different ways that you can add support for the slabs to ensure the stability and longevity of your structure.
  1. One way is to add rebar or wire mesh supports to the slab. This will help to reinforce it and prevent any cracking or breaking that may occur over time. 

  2. You can also add rebar support to a tilt-up slab when installing "sandwiched" insulation. When insulating tilt-up panels, you generally start with a reinforced base slab, then sandwich the insulation between a second reinforced slab. This adds overall strength to the structure, and has the added benefit of efficient wall-to-wall insulation. Both of these processes typically happen before the forms are removed and the wall is lifted.
After the forms are removed, the panel will have exposed edges where the door and window openings were cut. These edges can be finished in a number of ways, including attaching trim or covering them with stucco. Reveals and recesses can also be formed in the panels to create interesting architectural details.

Once the forms have been built, the concrete is poured and allowed to cure. The panels are then tilted into place using a crane or other heavy equipment.

Panel forming for tilt-up slabs is a fast and efficient way to construct large buildings. With proper planning and execution, panels can be formed quickly and easily, resulting in a high-quality finished product.


Panel Connections for Tilt-Up Slabs

Panel connections are an important part of tilt-up construction, as they help to secure the panels in place and provide support. There are several different types of panel connections that can be used, depending on the specific needs of the project.

  • Structural connections are the most common type of panel connection. They are typically made with steel plates and bolts and are     used to connect the panels to the structural frame of the building.
  • Footing connections are another type of panel connection that is used to connect the panels to the foundation or footing of the     building.
  • Slab-on-ground connections are used to connect the panels to a concrete slab that is poured on site.
  • Roof/elevated floor connections are used to connect the panels to the roof or an elevated floor of the building.
  • Panel-To-Panel connections are also an important part of the Tilt-Up process and are used to interconnect panels during     construction. These connections can be made with steel plates and bolts, shear studs, or welding. The most common type of     Panel-To-Panel Connection is the Lap Splice Connection. This connection is made by overlapping two panels and connecting them     with steel plates and bolts. Other types of Panel-To-Panel Connections include the Butt Splice Connection, the Corner Splice     Connection, and the Tee Splice Connection.

Tilt Up Precast and Accessories - Tilt Up Slabs

Use Of Chamfer & Rustication In Tilt-Wall

Chamfer and rustication are two important architectural features that are often used in tilt-up construction. Chamfer is an angled cut made at the edge of a board or piece of wood, while rustication is a decorative technique that involves creating a textured surface on stone or brick. Both of these features can add visual interest and appeal to a tilt-up building.

Chamfers are commonly used to create a clean, finished look at the edges of tilt-up panels. They can also be used to create interesting shadow lines and add visual interest to a façade. Rustication, on the other hand, is often used to give the appearance of stone or brick construction without the weight or cost. It can also be used to create a more traditional look.

Both chamfer and rustication can be used in a variety of ways to create unique looks for tilt-up buildings. When used together, they can create an even more interesting and appealing façade.


Accessories and Equipment to be Used with Tilt-Up Slabs

There are several types of equipment and accessories that can be used with tilt-up slabs, including brace inserts, ground anchors, HGA brackets, lifters, SL inserts, slant anchors, and tilt-up profiles. Each of these products has its own unique benefits and applications.

  • Brace inserts are used to provide additional support to the slab after lifting.
  • Ground anchors are used to secure the slab in place once it has been lifted into position.
  • HGA brackets are used to connect the slab to the structure’s frame.
  • Lifters are used to lift the slab into position.
  • SL inserts are used to provide additional support during lifting and lower the risk of cracking.
  • Slant anchors are used to secure the slab in place once it has been lifted into position.
  • Tilt-up profiles are used to create smooth reveals and chamfered edges.
  • Ring clutches are used to fasten the slab in place to be lifted into position.

Each of these products is essential for a successful tilt-up construction project. When selecting equipment and accessories for a project, it is important to consult with an experienced contractor or engineer to ensure that the products are compatible with the specific project requirements.
Tilt Up Precast Accessories - Bonded Breakers

Why Bond Breakers Are Important?

Bond breakers are an important part of the tilt-up construction process. They help to prevent the bonding of the tilt-up panels to the casting slab, which can cause problems when it comes time to lift the panels. Bond breakers also help to improve the finish of the tilt-up slab by providing a smoother surface for the application of finishes.

There are a variety of different types of bond breakers available on the market, and choosing the right one will depend on the specific needs of your project. In general, however, bond breakers can be divided into two main categories: water-based and oil-based. Water-based bond breakers are typically easier to apply and remove than their oil-based counterparts.

However, they may not provide as effective of a bond break between the tilt-up panel and the concrete pad or floor, which can lead to problems during removal. Oil-based bond breakers, on the other hand, typically provide an easier break from the casting slab but can be more difficult to apply and remove.
There have been recent advancements in water-based bond breakers that contain no wax or hydrocarbon resins. These water-based bond breakers chemically react with calcium hydroxide (a byproduct of the cement hydration reaction) and create a separating gel layer.

When selecting a bond breaker, it is important to consider the type of concrete that will be used in your project. For example, if you are using high-strength concrete, you will need to choose a bond breaker that is specifically designed for that type of concrete. Otherwise, you run the risk of the bond breaker not being strong enough to prevent the bonding of the tilt-up panel to the casting surface.